Section
Model photograph (Nicolais)
(Enlarge to 55k)
STRUCTURAL ENGINEER: Fairmile Construction Co. Ltd. made design drawings
MECHANICAL ENGINEER: Charrington Gardner Locket (London) Ltd.
ACOUSTICAL ENGINEER: Bolt Beranck & Newman
EARLIEST DATE: 23 October 1960
EARLIEST DATED DRAWING IN THE KAHN COLLECTION: 17 April 1961
LATEST DATE ON WORKING DRAWINGS IN THE KAHN COLLECTION: 26 October 1961
DATE OF COMPLETION OF CONSTRUCTION: 1 July 1961